Pacific Surfliner Corridor: Ortega PE/NEPA
|
CA
|
ARRA
|
Individual - PE / NEPA
|
$950,000
|
|
Los Angeles to Fullerton Triple Track
|
CA
|
ARRA
|
Individual - FD / Construction
|
$38,055,875
|
|
Kansas City to St Louis Corridor: Hermann Universal Crossover
|
MO
|
ARRA
|
Individual - PE / NEPA
|
$570,000
|
|
Adirondack Corridor: Ballston Spa Capacity Improvements
|
NY
|
ARRA
|
Individual - FD / Construction
|
$3,318,333
|
|
Empire Corridor South: Albany to Schenectady 2nd Track
|
NY
|
ARRA
|
Individual - FD / Construction
|
$91,200,000
|
|
Empire Corridor South: Grade Crossing Improvements - CSXT Milepost 75 to 143
|
NY
|
ARRA
|
Individual - FD / Construction
|
$2,450,000
|
|
Empire Corridor West: Rochester Station Improvement
|
NY
|
ARRA
|
Individual - FD / Construction
|
$1,500,000
|
|
Empire Corridor West: Buffalo-Depew Station Improvement
|
NY
|
ARRA
|
Individual - FD / Construction
|
$727,400
|
|
Kingston Capacity and Track Improvements
|
RI
|
ARRA
|
Individual - PE / NEPA
|
$1,200,000
|
|
New Haven to Hartford to Springfield Corridor
|
CT
|
ARRA
|
Individual - FD / Construction
|
$40,000,000
|
|
Chicago to Detroit Corridor: Dearborn, MI Station
|
MI
|
ARRA
|
Individual - FD / Construction
|
$28,204,450
|
|
Pacific Surfliner Corridor: MOW Spurs
|
CA
|
ARRA
|
Individual - FD / Construction
|
$1,720,000
|
|
Vermonter New England Central Railroad Route Improvements
|
VT
|
ARRA
|
Individual - FD / Construction
|
$50,000,000
|
|
Union Station Access Improvements
|
DC
|
FY09
|
Individual - FD / Construction
|
$4,270,500
|
|
Kansas City to St Louis Corridor: Rail Bridge over Osage River
|
MO
|
ARRA
|
Individual - FD / Construction
|
$22,640,000
|
|
Pacific Northwest Corridor: North Portland Jcts
|
OR
|
ARRA
|
Individual - PE / NEPA
|
$1,288,805
|
|
Pacific Northwest Corridor: Willbridge
|
OR
|
ARRA
|
Individual - PE / NEPA
|
$500,000
|
|
Pacific Surfliner Corridor: Railroad Crossover Program
|
CA
|
ARRA
|
Individual - FD / Construction
|
$8,400,000
|
|
Kansas City to St Louis Corridor: Webster Universal Crossover
|
MO
|
ARRA
|
Individual - FD / Construction
|
$2,340,305
|
|
Kansas City to St Louis Corridor: Missouri Rail Crossing Safety Improvements
|
MO
|
ARRA
|
Individual - FD / Construction
|
$1,920,000
|
|
Kansas City to St Louis Corridor: Bonnots Mill Universal Crossover
|
MO
|
ARRA
|
Individual - PE / NEPA
|
$611,200
|
|
Kansas City to St Louis Corridor: Knob Noster Passing Siding Extension
|
MO
|
ARRA
|
Individual - PE / NEPA
|
$836,800
|
|
Kansas City to St Louis Corridor: Kingsville Passing Siding
|
MO
|
ARRA
|
Individual - PE / NEPA
|
$958,800
|
|
Kansas City to St Louis Corridor: Strasburg Grade Separation
|
MO
|
ARRA
|
Individual - PE / NEPA
|
$850,000
|
|
Kansas City to St Louis Corridor: Double Track Lee's Summit to Pleasant Hill
|
MO
|
ARRA
|
Individual - PE / NEPA
|
$1,418,800
|
|
Long Bridge Preliminary Engineering-NEPA Study
|
DC
|
ARRA
|
Individual - PE / NEPA
|
$2,900,000
|
|
Crossing Signal Timing, Burlington Northern Santa Fe Fort Worth Sub
|
TX
|
ARRA
|
Individual - FD / Construction
|
$3,467,877
|
|
Pacific Northwest Corridor: Union Station Roof
|
OR
|
ARRA
|
Individual - FD / Construction
|
$5,900,000
|
|
Cab Car Bicycle Storage (Rolling Stock)
|
CA
|
ARRA
|
Individual - FD / Construction
|
$8,230,000
|
|
Locomotive Emissions Upgrade (Rolling Stock)
|
CA
|
ARRA
|
Individual - FD / Construction
|
$13,295,511
|
|
Chicago to Milwaukee Corridor: Truesdell Crossovers
|
WI
|
ARRA
|
Individual - FD / Construction
|
$11,074,934
|
|
Ottumwa Sub Crossover Improvements
|
IA
|
ARRA
|
Individual - FD / Construction
|
$17,309,080
|
|
Chicago to Milwaukee Corridor: Milwaukee Station Platform
|
WI
|
ARRA
|
Individual - FD / Construction
|
$678,021
|
|
Keystone Corridor: Grade Crossings
|
PA
|
ARRA
|
Individual - FD / Construction
|
$18,000,000
|
|
Keystone Corridor: Automatic Block Signaling/Central Control
|
PA
|
ARRA
|
Individual - PE / NEPA
|
$1,350,000
|
|
Keystone Corridor: Interlocking Design
|
PA
|
ARRA
|
Individual - PE / NEPA
|
$6,300,000
|
|
Pacific Surfliner Corridor: Oceanside Stub Project
|
CA
|
ARRA
|
Individual - FD / Construction
|
$3,400,000
|
|
Portal Bridge
|
NJ
|
ARRA
|
Individual - FD / Construction
|
$38,500,000
|
|
Chicago to Detroit Corridor: Troy, MI Station
|
MI
|
ARRA
|
Individual - FD / Construction
|
$8,485,212
|
|
Chicago to Detroit Corridor: Battle Creek, MI Station
|
MI
|
ARRA
|
Individual - FD / Construction
|
$3,620,552
|
|
Capital Corridor: South Terminal Station Improvement
|
CA
|
ARRA
|
Individual - FD / Construction
|
$18,000,000
|
|
Capital Corridor: Yolo West Crossover
|
CA
|
ARRA
|
Individual - FD / Construction
|
$4,854,369
|
|
B&P Tunnel
|
MD
|
ARRA
|
Individual - PE / NEPA
|
$60,000,000
|
|
Baltimore-Washington International Airport Station Improvements
|
MD
|
ARRA
|
Individual - PE / NEPA
|
$9,400,000
|
|
Englewood Flyover
|
IL
|
ARRA
|
Individual - FD / Construction
|
$125,986,998
|
|
Capital Corridor: Track Relocation
|
CA
|
FY09
|
Individual - FD / Construction
|
$6,200,000
|
|
Empire Corridor Planning
|
NY
|
FY09
|
Planning Project
|
$1,000,000
|
|
Atlanta to Birmingham Feasibility Study
|
GA
|
FY09
|
Planning Project
|
$250,000
|
|
Interstate Rail Passenger Network Compact
|
GA
|
FY09
|
Planning Project
|
$250,000
|
|
Macon to Jacksonville Feasibility Study
|
GA
|
FY09
|
Planning Project
|
$250,000
|
|
Pacific Surfliner Corridor: Strategic Assessment
|
CA
|
FY09
|
Planning Project
|
$200,000
|
|
Colorado State Rail Plan
|
CO
|
FY09
|
Planning Project
|
$400,000
|
|
West Virginia HSIPR Planning
|
WV
|
FY09
|
Planning Project
|
$1,000,000
|
|
NY-VT Bi-State Intercity Passenger Rail Project
|
VT
|
FY09
|
Planning Project
|
$500,000
|
|
Chicago to Omaha Passenger Rail Planning
|
IA
|
FY09
|
Planning Project
|
$1,000,000
|
|
Kansas Service Development Plan (SDP)
|
KS
|
FY09
|
Planning Project
|
$250,000
|
|
Delaware Intercity Rail Connection
|
DE
|
FY09
|
Planning Project
|
$450,000
|
|
New Mexico State Rail Plan
|
NM
|
FY09
|
Planning Project
|
$100,000
|
|
Keystone Corridor: Keystone West
|
PA
|
FY09
|
Planning Project
|
$750,000
|
|
Chicago to St. Louis Double Track NEPA
|
IL
|
FY09
|
Planning Project
|
$1,250,000
|
|
Wisconsin Service NEPA
|
MN
|
FY09
|
Planning Project
|
$600,000
|
|
Denver Interregional Connectivity Study
|
CO
|
FY09
|
Planning Project
|
$1,000,000
|
|
Downeaster Portland North Project
|
ME
|
ARRA
|
Corridor Project
|
$35,000,000
|
|
Knowledge Corridor - Restore Vermonter
|
MA
|
ARRA
|
Corridor Project
|
$72,800,000
|
|
Phase 1 HSR Program - PE/NEPA/CEQAs
|
CA
|
ARRA
|
Individual Project within Corridor
|
$231,500,000
|
|
Phase 1 HSR Program - PE/NEPA/CEQA and Fresno/Bakersfield HSR - Design/Build
|
CA
|
ARRA
|
Individual Project within Corridor
|
$2,234,676,231
|
|
Pacific Northwest Corridor: Service Block 2-SEA-PDX 6 RTs
|
WA
|
ARRA
|
Individual Project within Corridor
|
$590,000,000
|
|
Tampa to Orlando: Program Management and Preliminary Engineering
|
FL
|
ARRA
|
Individual Project within Corridor
|
$66,660,000
|
|
Cleveland to Cincinnati: Project NEPA and Preliminary Engineering
|
OH
|
ARRA
|
Individual Project within Corridor
|
$0
|
|
Milwaukee to Madison: Environmental Assessments and Stations
|
WI
|
ARRA
|
Individual Project within Corridor
|
$0
|
|
Milwaukee to Madison: Corridor Design, Madison-Watertown and Watertown-Milwaukee
|
WI
|
ARRA
|
Individual Project within Corridor
|
$0
|
|
Charlotte to Raleigh: Stations and Facilities Phase One
|
NC
|
ARRA
|
Individual Project within Corridor
|
$16,907,922
|
|
Charlotte to Raleigh: Equipment Procurements and Rehabilitation
|
NC
|
ARRA
|
Individual Project within Corridor
|
$20,333,936
|
|
Chicago to St. Louis: 2010 Early Construction Projects
|
IL
|
ARRA
|
Individual Project within Corridor
|
$100,133,604
|
|
Transbay Transit Center Train Box
|
CA
|
ARRA
|
Individual Project within Corridor
|
$400,000,000
|
|
Milwaukee to Madison: Land Bridges
|
WI
|
ARRA
|
Individual Project within Corridor
|
$0
|
|
Milwaukee to Madison: High-Speed Intercity Passenger Rail
|
WI
|
ARRA
|
Individual Project within Corridor
|
$30,000,000
|
|
Chicago to St. Louis: Remaining Program Work
|
IL
|
ARRA
|
Individual Project within Corridor
|
$1,042,190,396
|
|
Charlotte to Raleigh: Program Development and Preliminary Engineering
|
NC
|
ARRA
|
Individual Project within Corridor
|
$21,663,532
|
|
Oklahoma State Rail Plan
|
OK
|
FY10 Planning
|
Planning Project - State Rail Plan
|
$375,000
|
|
Boston-Concord Corridor Plan
|
NH
|
FY10 Planning
|
Service Development Plan and Corridor-Wide NEPA (Passenger Rail Corridor Investment Plan)
|
$2,240,000
|
|
Oklahoma City-South Texas Corridor Plan
|
TX
|
FY10 Planning
|
Service Development Plan and Corridor-Wide NEPA (Passenger Rail Corridor Investment Plan)
|
$5,600,000
|
|
Moorpark-San Onofre Signal and Communication System Improvements
|
CA
|
FY09 Residual
|
Individual Project - FY09 Residual
|
$13,500,000
|
|
Tukwila Station Construction
|
WA
|
FY09 Residual
|
Individual Project - FY09 Residual
|
$7,930,850
|
|
San Onofre-San Diego PTC Implementation
|
CA
|
FY09 Residual
|
Individual Project - FY09 Residual
|
$24,900,000
|
|
West Detroit Rail Improvements
|
MI
|
FY09 Residual
|
Individual Project - FY09 Residual
|
$7,912,773
|
|
Wadsworth Bridge Replacement
|
IL
|
FY09 Residual
|
Individual Project - FY09 Residual
|
$3,710,960
|
|
Eugene-Portland Corridor Plan
|
OR
|
FY10 Planning
|
Service Development Plan and Corridor-Wide NEPA (Passenger Rail Corridor Investment Plan)
|
$4,200,000
|
|
Washington State Rail Plan
|
WA
|
FY10 Planning
|
Planning Project - State Rail Plan
|
$400,000
|
|
Nevada State Rail Plan
|
NV
|
FY10 Planning
|
Planning Project - State Rail Plan
|
$640,000
|
|
Boston-Portland Corridor Plan
|
ME
|
FY10 Planning
|
Service Development Plan and Corridor-Wide NEPA (Passenger Rail Corridor Investment Plan)
|
$600,000
|
|
Chicago-Detroit HSR Corridor Plan
|
MI
|
FY10 Planning
|
Service Development Plan and Corridor-Wide NEPA (Passenger Rail Corridor Investment Plan)
|
$3,200,000
|
|
Oregon State Rail Plan
|
OR
|
FY10 Planning
|
Planning Project - State Rail Plan
|
$800,000
|
|
Missouri State Rail Plan
|
MO
|
FY10 Planning
|
Planning Project - State Rail Plan
|
$500,000
|
|
Idaho State Rail Plan
|
ID
|
FY10 Planning
|
Planning Project - State Rail Plan
|
$200,000
|
|
Iowa State Rail Plan
|
IA
|
FY10 Planning
|
Planning Project - State Rail Plan
|
$400,000
|
|
Charlotte-Atlanta Corridor Plan
|
GA
|
FY10 Planning
|
Service Development Plan and Corridor-Wide NEPA (Passenger Rail Corridor Investment Plan)
|
$4,100,000
|
|
Los Angeles-San Francisco Corridor Plan
|
CA
|
FY10 Planning
|
Service Development Plan and Corridor-Wide NEPA (Passenger Rail Corridor Investment Plan)
|
$300,000
|
|
Tulsa-Oklahoma City Corridor Plan
|
OK
|
FY10 Planning
|
Service Development Plan and Corridor-Wide NEPA (Passenger Rail Corridor Investment Plan)
|
$2,242,050
|
|
Bakersfield-Oakland-Sacramento (San Joaquin) Corridor Plan
|
CA
|
FY10 Planning
|
Service Development Plan Only (Passenger Rail Corridor Investment Plan)
|
$300,000
|
|
California State Rail Plan
|
CA
|
FY10 Planning
|
Planning Project - State Rail Plan
|
$1,500,000
|
|
Los Angeles-San Luis Obispo Corridor Plan
|
CA
|
FY10 Planning
|
Service Development Plan and Corridor-Wide NEPA (Passenger Rail Corridor Investment Plan)
|
$1,360,000
|
|
Richmond-DC: PE/NEPA Completion
|
VA
|
FY10 Individual
|
Individual - PE / NEPA
|
$44,308,000
|
|
Pacific Surfliner: PE/NEPA for Double Track
|
CA
|
FY10 Individual
|
Individual - PE / NEPA
|
$400,000
|
|
Raymer-Bernson: PE/NEPA for Double Track, Grade Crossings, New Bridges, New Platform
|
CA
|
FY10 Individual
|
Individual - PE / NEPA
|
$1,564,000
|
|
Oceanside: PE/NEPA for Bridge Replacement with Double Track
|
CA
|
FY10 Individual
|
Individual - PE / NEPA
|
$4,000,000
|
|
San Diego: PE/NEPA for Double Track
|
CA
|
FY10 Individual
|
Individual - PE / NEPA
|
$10,000,000
|
|
Pacific Surfliner: PE/NEPA for Double Track, Curve Realignments
|
CA
|
FY10 Individual
|
Individual - PE / NEPA
|
$3,142,000
|
|
Northeast Corridor Third Track Installment
|
DE
|
FY10 Individual
|
Individual - FD / Construction
|
$13,300,000
|
|
Union Depot Multi-Modal Transit Hub
|
MN
|
FY10 Individual
|
Individual - FD / Construction
|
$40,000,000
|
|
Oklahoma City Depot Control Signaling and Power Switch Installment
|
OK
|
FY10 Individual
|
Individual - FD / Construction
|
$1,660,793
|
|
St. Louis Third Main Track Construction
|
MO
|
FY10 Individual
|
Individual - FD / Construction
|
$3,608,640
|
|
Boston South Station Expansion Project
|
MA
|
FY10 Individual
|
Individual - PE / NEPA
|
$32,500,000
|
|
Van Nuys Boulevard: PE/NEPA for Bridge Widening, New Platform, System Improvements
|
CA
|
FY10 Individual
|
Individual - PE / NEPA
|
$800,000
|
|
Del Mar: PE/NEPA for Second Track, Bridge, Signal Improvements
|
CA
|
FY10 Individual
|
Individual - PE / NEPA
|
$7,000,000
|
|
Seacliff: PE/NEPA for Track Realignment, Siding Extension
|
CA
|
FY10 Individual
|
Individual - PE / NEPA
|
$950,000
|
|
Union Station: Structural Improvements, Track Improvements
|
OR
|
FY10 Individual
|
Individual - PE / NEPA
|
$3,967,243
|
|
Livingston Avenue: PE/NEPA for Bridge Replacement
|
NY
|
FY10 Individual
|
Individual - PE / NEPA
|
$2,000,000
|
|
Lawrence: PE and FD for Station Improvements
|
KS
|
FY10 Individual
|
Individual - PE / NEPA
|
$87,563
|
|
Central Valley HSR: Fresno-Bakersfield or Merced-Fresno
|
CA
|
FY10 SDP
|
Service Development Program
|
$715,000,000
|
|
San Francisco-San Jose HSR
|
CA
|
FY10 SDP
|
Service Development Program
|
$16,000,000
|
|
Statewide Rolling Stock Acquisition
|
CA
|
FY10 SDP
|
Service Development Program
|
$100,000,000
|
|
Hudson Subdivision Signal Reliability
|
NY
|
FY10 Individual
|
Individual - FD / Construction
|
$7,913,687
|
|
King Street Station Rehabilitation
|
WA
|
FY10 Individual
|
Individual - FD / Construction
|
$16,685,752
|
|
Kalamazoo-Dearborn Corridor Development
|
MI
|
FY10 SDP
|
Service Development Program
|
$150,000,000
|
|
Piedmont Corridor, Phase I: Charlotte Station and Grade Separation Program
|
NC
|
FY10 SDP
|
Service Development Program
|
$22,000,000
|
|
Charlotte to Raleigh: Piedmont Corridor Construction Program
|
NC
|
ARRA
|
Individual Project within Corridor
|
$461,094,610
|
|
Milwaukee to Madison: High-Speed Intercity Passenger Rail
|
WI
|
ARRA
|
Individual Project within Corridor
|
$0
|
|
Pacific Northwest Corridor: Service Block 2-SEA-PDX 6 RTs- ARRA Redistributed
|
WA
|
ARRA
|
Individual Project within Corridor
|
$145,458,912
|
|
Downeaster-Portland North Project- ARRA Redistributed
|
ME
|
ARRA
|
Corridor Project
|
$3,385,495
|
|
California Passenger Rail Car and Locomotive Acquisition Phase 2
|
CA
|
ARRA
|
Corridor Project
|
$68,000,000
|
|
NEC Kingston Track, Platform Improvements
|
RI
|
ARRA
|
Individual - FD / Construction
|
$25,000,000
|
|
Eugene Station Stub Tracks
|
OR
|
ARRA
|
Individual - PE / NEPA
|
$1,500,000
|
|
Port of Vancouver Grade Separation
|
WA
|
ARRA
|
Individual - FD / Construction
|
$15,000,000
|
|
NEC Providence Station Improvements
|
RI
|
ARRA
|
Individual - PE / NEPA
|
$3,000,000
|
|
Ann Arbor Station Project
|
MI
|
ARRA
|
Individual - PE / NEPA
|
$2,806,400
|
|
NEC Harold Interlocking Amtrak Bypass Routes
|
NY
|
ARRA
|
Individual - FD / Construction
|
$294,781,579
|
|
Initial Central Valley Construction Project- Extension to Merced Station and Bakersfield Station
|
CA
|
ARRA
|
Service Development Program
|
$86,380,000
|
|
Initial Central Valley Construction Project Extension
|
CA
|
FY10 SDP
|
Service Development Program
|
$213,620,000
|
|
Midwest Next Generation Passenger Rail Equipment Purchase
|
IL
|
ARRA
|
Individual - FD / Construction
|
$268,201,084
|
|
New Haven-Springfield Track Construction
|
CT
|
ARRA
|
Service Development Program
|
$30,000,000
|
|
Keystone Corridor Interlocking Improvements
|
PA
|
ARRA
|
Service Development Program
|
$40,000,000
|
|
Chicago - St. Louis Corridor, Dwight to Joliet
|
IL
|
FY10 SDP
|
Service Development Program
|
$186,380,000
|
|
Kalamazoo-Dearborn Service Development Program 2
|
MI
|
ARRA
|
Service Development Program
|
$196,503,208
|
|
Merchant's Bridge Replacement
|
MO
|
ARRA
|
Individual - FD / Construction
|
$13,500,000
|
|
NEC Bridge Replacement
|
MD
|
ARRA
|
Individual - PE / NEPA
|
$22,000,000
|
|
Downeaster Track Improvements
|
ME
|
ARRA
|
Individual - FD / Construction
|
$20,822,341
|
|
Rochester Station and Track Improvements
|
NY
|
ARRA
|
Individual - PE / NEPA
|
$1,400,000
|
|
Empire Corridor Capacity Improvements
|
NY
|
ARRA
|
Individual - FD / Construction
|
$58,131,756
|
|
Northern Lights Express
|
MN
|
ARRA
|
Individual - PE / NEPA
|
$5,000,000
|
|
Dallas - Fort Worth to Houston Core Express Service
|
TX
|
ARRA
|
Individual - PE / NEPA
|
$15,000,000
|
|
NEC Power, Signal, Track, Catenary Improvements
|
Amtrak
|
ARRA
|
Service Development Program
|
$449,944,000
|
|
Charlotte to Richmond Service Enhancement
|
NC
|
ARRA
|
Service Development Program
|
$4,000,000
|
|
Vermonter New England Central Railroad Route Improvements - ARRA Redistributed
|
VT
|
ARRA
|
Individual - FD / Construction
|
$2,722,258
|
|
Pacific Northwest Corridor: Service Block 2-SEA-PDX 6 RTs - ARRA Redistributed 2
|
WA
|
ARRA
|
Individual Project within Corridor
|
$16,116,188
|
|
Pacific Northwest Corridor: Union Station Roof - ARRA Redistributed
|
OR
|
ARRA
|
Individual - FD / Construction
|
$1,340,582
|
|
Chicago-Iowa City New Corridor Service
|
IL
|
FY10 SDP
|
Service Development Program
|
$177,280,000
|