image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout
US Department of Transportation Home Layout Image Home Button Site Index Button Issue Briefs Button FOIA Button Employment Button image used for layout
About the FRA
Safety
Freight Rail
Passenger Rail
Research & Development
Press Room
Legislation, Regulation, Litigation.
Civil Rights & Accessibility


DOT Site Search:

FRA-only 

The Federal Railroad Administration Train passing pines with mountain peaks in the
background.


TABLE OF CONTENTS

COVER PAGE

EXECUTIVE SUMMARY

INTRODUCTION
     
EXISTING LAWS, RULES, REGULATIONS AND POLICIES

HIGHWAY-RAIL GRADE CROSSING PERSPECTIVE

Motor Vehicle Driver Needs on the Approach - Page 4
Advanced Notice-Stopping Sight Distance - Page 4
Traffic Control Device Comprehension - Page 4
Deciding to Proceed - Page 5
Approach (Corner) Sight Distance - Page 5
Clearing Sight Distance - Page 6
Systems Operating Requirements and Objectives - Page 9
Highway Systems Objectives - Page 10
Levels of Service - Page 11
Safe Approach Speed - Page 12
Railroad Systems - Functional Classification - Page 13
Function, Geometric Design and Traffic Control - Page 14

TRAFFIC CONTROL DEVICES

General Discussion - Page 15
Passive Devices - Page 15
Highway-Rail Grade Crossing (Crossbuck) Signs - Page 18
Stop and Yield signs - 19
Active Devices - 20
Standard Active Devices - Page 20
Flashing-Light Signal - Page 20
Cantilever Flashing-Light Signal - Page 21
Automatic Gate - Page 21
Additional Flashing-Light Signals - Page 21
Supplemental Active Devices - Page 21
Active Advance Warning Signs with Flashers - Page 21
Active Turn Restriction Signs - Page 22
Median Separation - Page 22
Barrier Wall Systems - Page 23
Wide Raised Medians - Page 23
Non-Mountable Curb Islands - Page 23
Mountable Raised Curb Systems - Page 24
Other Barrier Devices - Page 24
Four-Quadrant Traffic Gate Systems - Page 24
Vehicle Arresting Barrier System - Barrier Gate - Page 25
Train Detection Systems - Page 26
Warning Time and System Credibility - Page 26
Interference / Integrity of Active Traffic Control Device Systems - Page 27
Types of Detection - Page 27
DC, AC-DC or AF0 - Page Grade Crossing Island and Approach Circuits - Page 27
Motion Sensing Devices (MS) - Page 27
Constant Warning Time (CWT) Systems - Page 28
Railroad Train Detection Time and Approach Length
    Calculations - Page 28
Preemption/Interconnection - Page 28
When to Interconnect - Page 28
Factors to Consider - Page 29
Joint Agency Coordination - Page 29
Extended Advance Warning Times - Page 29
Second Train Circuitry at Multiple Track Crossings - Page 29
Diagonal Railroad Crossing Both Highway Approaches to the
    Intersection - Page 30
Pre-Signals - Page 30
Long Distance between the Highway-Rail Crossing and the Highway
    Intersection - Page 32
Queue Cutter Flashing-light Beacon - Page 32
Other Special Conditions - Page 33
Potential Queuing across Tracks - Page 33
Train and LRT Activated Highway Traffic Signals - Page 33
2nd Train Coming Active Warning Sign - Page 34
Pedestrian and Bicyclists Considerations - Page 34

ALTERNATIVES TO MAINTAINING THE CROSSING

Crossing Closure - Page 35
Grade Separation - Page 35
Traffic Separation Study Approach to Crossing
Consolidation - Page 36

NEW CROSSINGS/GUIDANCE

Minimum Devices - Page 38
Minimal Widths - Page 38
Passive - Minimum Traffic Control Applications - Page 38
Active - Page 40
Closure - Page 43
Grade Separation - Page 45
New Crossings - Page 46

TRAFFIC CONTROL DEVICE SELECTION PROCEDURE

Step 1 - Minimum Highway-Rail Grade Crossing Criteria - Page 48
Step 2 - Evaluate Highway Traffic Flow Characteristics - Page 49
Step 3 - Possible Revision to the Highway-Rail Grade
            Crossing - Page 49
Step 4 - Interim Measures and/or Documentation - Page 49

REFERENCES - Page 51

GLOSSARY - Page 53

APPENDIX

Preemption/Interconnection - Page 55
Pedestrian Clearance Phase - Page 55
Traffic Signal Controller Re-Service Considerations - Page 56
Programming Security - Page 56
Supervised Interconnect Circuitry - Page 57
Advance Preemption and Use of Timers - Page 57
Standby Power Sources - Page 58

List of Tables

Table 1 Federal Laws, Rules, Regulations & Policies - Page 3
Table 2 Clearing Sight Distance - Page 7
Table 3 Guide for Selection of Design Levels of Service - Page 12
Table 4 Maximum Train Speeds by Class of Track - Page 13
Table 5A Current MUTCD Devices - Page 16
Table 5B Not Currently Proposed in the MUTCD - Experimental     Devices - Page 18
Table 6 Guidelines for Active Devices - Page 41
Table 7 LRT Grade Separation - Page 46

List of Figures

Figure 1 Clearing Sight Distance at a Single Track Highway-Rail     Grade Crossing - Page 7
Figure 2 Pedestrian Sight Triangle - Page 9
Figure 3 Desire Lines of Travel, Road Network Provided - Page 11
Figure 4 Pre-Signal Location at Automatic Gate Crossing - Page 30



layout image

About Us | Website Polices | Plug-ins | Privacy Policy | Site Index | Common Questions | Contact Us | Home | OIG Hotline


Federal Railroad Administration, U.S. Department of Transportation, 1200 New Jersey Avenue, SE, Washington, DC 20590