image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout
US Department of Transportation Home Layout Image Home Button Site Index Button Issue Briefs Button FOIA Button Employment Button image used for layout
About the FRA
Railroad Safety
Freight Rail
Passenger Rail
Research & Development
Press Room
Legislation, Regulation, Litigation & Enforcement.
Civil Rights & Accessibility


DOT Site Search:

FRA-only 

The Federal Railroad Administration Train passing pines with mountain peaks in the
background.

S-09-01 - Clarification Regarding the Necessary Approval for Signal-Related Results of Inspections and Tests;
                Electronic Recordkeeping

S-08-02 - Clarification Regarding the Application of the Requirements Associated with Warning Time Testing of
               Highway-Rail Grade Crossing Active Warning Systems

S-07-01 - Software Management Control Plan - Defect Codes

S-06-01 - Correction and Further Clarification to "Introduction to Software Configuration Management"

               Introduction to Software Configuration Management - 08-08-06

S-05-01 - Application and Enforcement Guidance Related to Interpretation of Movable Bridge Interlocking
               of Signal Appliances with Bridge Devices

S-04-01 - Application and Enforcement Guidance Related to Interpretation of Periodic Testing Intervals

S-99-06 - Clarification of Application, Interpretation and Enforcement of 49 CFR Section 234.273

S-99-04 - The S&TC Technical Resolution Committee meeting in Omaha, Nebraska the week of August 16,1999,
               acted on a request for clarification of the application of 49 CFR Section 236.407. The matter before the
               committee was to determine if the requirements of this rule are applicable to a location where the route
               can be changed through the use of a hand-operated switch.

S-99-03 - Clarification of Application, Interpretation and Enforcement of 49 CFR Sections 234.213, 236.2,
               234.249 and 236.107

S-99-01 - Clarification of Application of 49 CFR Sections 236.023

S-96-10 - Interpretation and Application of 49 CFR Section 234.257

S-96-09 - Interpretation and Application of 49 CFR Sections 234.245

S-96-08 - Application of 49 CFR Sections 234.105, 234.106 and 234/107

S-96-07 - Revision of Interpretation and Application of 49 CFR Section 234.221

S-96-06 - Manually Operated Warning Systems

S-96-05 - Revision of Interperation and Application of 49 CFR Section 236.110

S-96-04 - This FRA Technical Bulletin does not exist

S-96-03 - Concerns in Conjunction with 49 CFR 236.567

S-96-02 - Revision of Interpretation and Application of 39 CFR Section 236.380

S-96-01 - Revision of Interpretation and Application of 49 CFR Section 236.330

layout image

About Us | Website Polices | Plug-ins | Privacy Policy | Site Index | Common Questions | Contact Us | Home | OIG Hotline


Federal Railroad Administration, U.S. Department of Transportation, 1200 New Jersey Avenue, SE, Washington, DC 20590