Environmental Impact Statement
Environmental Impact Statement The FRA is serving as the lead federal agency for the environmental review of the DesertXpress High-Speed Passenger Train project and has prepared the Draft Environmental Impact Statement (DEIS). The DesertXpress project is proposed by DesertXpress Enterprises, LLC to provide reliable and safe passenger rail transportation along an approximate 200-mile corridor between Southern California (Victorville) and Las Vegas, Nevada, as an alternative to automobile or air travel. The DEIS has been prepared in cooperation with the Bureau of Land Management (BLM), Surface Transportation Board (STB), Federal Highway Administration (FHWA), and the National Park Service (NPS), with the added participation of the California Department of Transportation (Caltrans) and the Nevada Department of Transportation (NDOT).
The project would use proven high-speed rail technology and be constructed as a grade-separated, dedicated double track, passenger-only railroad predominantly in the median of or immediately alongside Interstate 15 (I-15), adding transportation capacity to the freeway corridor. The DEIS identifies and analyzes the potential environmental impacts (both beneficial and adverse) that could occur to a range of environmental resources as a result of the construction and operation of the project alternatives. At this time, the federal agencies have not identified a preferred alternative, and are considering the impacts of the project and seeking public and agency comments to inform the decision on a preferred alternative.
The deadline for comments on this DEIS is May 22, 2009
.
Comments submitted via US mail must be postmarked by this date and addressed to:
Federal Railroad Administration
1200 New Jersey Avenue S.E. MS-20
Washington, DC 20590
Attn: DesertXpress EIS
Comments sent via email should be sent no later than 5:00 pm Eastern Standard Time on May 22, 2009 addressed to: wendy.messenger@dot.gov
with the subject line, “DesertXpress DEIS.”
FRA will also hold three hearing on the DEIS:
Las Vegas Area:
Tuesday, April 28, 2009
5:30 – 8:00 p.m.
Hampton Inn Tropicana
4975 Dean Martin Drive
Las Vegas, NV 89118 |
Barstow Area:
Wednesday, April 29 2009
5:30 – 8:00 p.m.
Ramada Inn
1511 East Main Street
Barstow, CA 92311 |
Victorville Area: Thursday, April 30 2009
5:30 – 8:00 p.m.
Green Tree Golf Course
14144 Green Tree Boulevard
Victorville, CA 92395
|
The DEIS is being made available to the public in accordance with the National Environmental Policy Act for comment through May 22, 2009. DEIS web files have a lower resolution graphics for easier download and the maps with greatest detail are in Appendix A. To request a CD of the DEIS please send an email as directed above.
View the Draft Environmental Impact Statement:
DEIS Volume I Complete (27.6 mb .pdf)
DEIS TOC and Executive Summary (1.3 mb .pdf)
DEIS Chapter 1 (669 kb .pdf)
DEIS Chapter 2 (10.1 mb .pdf)
DEIS Chapter 3 (14.5 mb .pdf)
DEIS Chapter 4 (45 kb.pdf)
DEIS Chapter 5 (118 kb .pdf)
Volume II (Appendices)
Appendix_A-1_Plan_and_Profile_Drawings_Segment_1.pdf
Appendix_A-1_Plan_and_Profile_Drawings_Segment_2.pdf
Appendix_A-1_Plan_and_Profile_Drawings_Segment_3.pdf
Appendix_A-1_Plan_and_Profile_Drawings_Segment_4.pdf
Appendix_A-1_Plan_and_Profile_Drawings_Segment_5.pdf
Appendix_A-1_Plan_and_Profile_Drawings_Segment_6.pdf
Appendix_A-1_Plan_and_Profile_Drawings_Segment_7.pdf
Appendix_A-2_Large_Scale_Maps_Action_Alternatives.pdf
Appendix_A-3_Station_Site_Plan.pdf
Appendix_A-4_MSF_Plans.pdf
Appendix_A-5_Autotransformers.pdf
Appendix_B_Ridership_Forecast_Review.pdf
Appendix_C_Review_of_Operations_Plan.pdf
Appendix_D_NRCS_CPA_106_Forms.pdf
Appendix_E_Traffic_Impact_Analysis.pdf
Appendix_F_Cultural_and_Paleontological_Resources.pdf
Appendix_G_SHPO_and_Tribal_Consultation.pdf
Appendix_H_Preliminary_Geotechnical_Investigation.pdf
Appendix_I_Hazardous_Materials_Assessment.pdf
Appendix_J_Air_Quality_Calculations.pdf
Appendix_K_Energy_Data.pdf
Appendix_L_Special-Status_Plant_and_Wildlife_Species.pdf
Appendix_M_USFWS_Listed_Proposed_and_Candidate_Species.pdf
Appendix_N_Mohave_Ground_Squirrel_Habitat_Assessment.pdf
Appendix_O_Vegetation_Mapping_Surveys.pdf
Appendix_P_Scoping_Summary_and_Appendicespdf.pdf
View the Notice of Intent
to prepare the EIS.