image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout
US Department of Transportation Home Layout Image Home Button Site Index Button Issue Briefs Button FOIA Button Employment Button image used for layout
About the FRA
Safety
Freight Rail
Passenger Rail
Research & Development
Press Room
Legislation, Regulation, Litigation.
Civil Rights & Accessibility


DOT Site Search:

FRA-only 

The Federal Railroad Administration Train passing pines with mountain peaks in the
background.

Q-1. “What is a false proceed signal failure?”

A. Section 233.7 states in part: “. . . each failure of an appliance, device, method, or system to function or indicate as required by part 236 of this title that results in a more favorable aspect than intended or other condition hazardous to the movement of a train.”

Q-2. “When is a railroad required to report a false proceed signal failure?”

A. Section 233.7 states in part: “Each carrier shall report within 15 days each failure of an appliance, device, method, or system . . .”

Note that section 233.5 requires that “Each carrier shall report within 24 hours to the Federal Railroad Administration by toll-free telephone number 800-424-0201, whenever it learns of the occurrence of an accident/incident arising from the failure of an appliance, device, method, or system . . .”

Q-3. “What is a “Phantom Signal Aspect” and is it required to be reported to FRA?”

A. A phantom signal aspect is an aspect displayed by a signal, different from the aspect intended, caused by light from some external source being reflected by the optical system of the signal. A phantom aspect is required to be reported as a false proceed, under section 233.7, when it results in a more favorable aspect than intended or other condition hazardous to the movement of a train.

Q-4. “When is a railroad required to submit a report of signal systems and methods of train operation?”

A. Section 233.9 requires that Form FRA F 6180-47, Signal System Five-Year Report, shall be submitted no later than April 1, 1997, and every 5 years thereafter (next report due by April 1, 2007). For new railroads, the report should be submitted prior to their commencing operations.