Final Rule

49 CFR Part 229, 234, 235, et al: Positive Train Control Systems; Final Rule

  • 12
  • Jan
  • 2010
AUTHOR: Federal Railroad Administration
DOCKET NUMBER: FRA–2008–0132, Notice No. 3; RIN 2130–AC03
KEYWORDS: PTC
ABSTRACT: This final rule includes required functionalities of PTC system technology and the means by which PTC systems will be certified. This final rule also describes the contents of the PTC implementation plans required by the statute and contains the process for submission of those plans for review and approval by FRA.
Pdf Download PDF Document [695.7 KB]

####