Technical Bulletins

Clarification Regarding the Application of the Requirements Associated with Warning Time Testing of Highway-Rail Grade Crossing Active Warning Systems

  • 22
  • Jul
  • 2008
AUTHOR: Office of Railroad Safety
TB NUMBER: S-08-02
DISCIPLINE: Signal and Train Control
SUBJECT: Signal and Train Control
KEYWORDS: prescribed warning time; basic single track location; double track location; turnout; crossover
Pdf Download PDF Document [234.9 KB]

####