Final Rule

Positive Train Control Systems

  • 15
  • Jan
  • 2010
DOCKET NUMBER: 2008-0132
SUBJECT: Positive Train Control
KEYWORDS: PTC, Subpart I, PTC Rule 1, Rail Safety Improvement Act of 2008
ABSTRACT: FRA is issuing regulations implementing a requirement of the Rail Safety Improvement Act of 2008 that defines criteria for certain passenger and freight rail lines requiring the implementation of positive train control (PTC) systems. This final rule includes required functionalities of PTC system technology and the means by which PTC systems will be certified. This final rule also describes the contents of the PTC implementation plans required by the statute and contains the process for submission of those plans for review and approval by FRA. These regulations could also be voluntarily complied with by entities not mandated to install PTC systems. This is a final rule; however, FRA has identified specific provisions for which we are considering making changes to the final rule, if warranted by the public comments received. We expect to publish our response to those comments, including any possible changes to the rule made as a result of them, as soon as possible following the end of the comment period. Howe
Pdf Download PDF Document [665.6 KB]

####