Proposed Rule

Positive Train Control Systems

  • 21
  • Jul
  • 2009
DOCKET NUMBER: 2008-0132
SUBJECT: Positive Train Control
KEYWORDS: PTC, Subpart I, PTC Rule 1, Rail Safety Improvement Act of 2008
ABSTRACT: FRA proposes regulations implementing a requirement of the Rail Safety Improvement Act of 2008 that certain passenger and freight railroads install positive train control systems. The proposal includes required functionalities of the technology and the means by which it would be certified. The proposal also describes the contents of the positive train control implementation plans required by the statute and contains the proposed process for submission of those plans for review and approval by FRA. These proposed regulations could also be voluntarily complied with by entities not mandated to install positive train control systems.
Pdf Download PDF Document [420.5 KB]

Due to our recent website upgrade some of the links in legacy documents might point to the decommissioned site location.  We recommend that users take advantage of the search engine above to locate the material they seek on the current website.  Be assured that we are working diligently to upgrade all legacy documents containing outdated links and to keep our content as current as possible.

Revised Links

pages 6:  http://www.fra.dot.gov/eLib/details/L02840

 

####