Other Reports

Performance of Two Concrete Bridges at the Facility for Accelerated Service Testing for 500 MGT

  • 01
  • Oct
  • 2008
AUTHOR: Leonard Allen
OFFICE: RPD
REPORT NUMBER: RR08-15
KEYWORDS: State-of-the-art bridge, heavy axle load, prestressed concrete tie, cast-in rubber pads, screw spike
Pdf Download PDF Document [289.8 KB]

####