Research Results

Positive Train Control Test Bed Interoperability Upgrades

  • 05
  • Feb
  • 2013
AUTHOR: Jared Withers and Richard Morgan
REPORT NUMBER: RR 13-03
SUBJECT: Positive Train Control, Signal and Train Control
KEYWORDS: Positive Train Control (PTC), test bed, control points, Wayside Interface Units (WIUs), signal blocks, grade crossings, Interoperable Train Control (ITC)
Pdf Download PDF Document [140.9 KB]

####