Technical Reports

Accountability of Railtrack

  • 01
  • May
  • 2001
AUTHOR: Office of the Rail Regulator
OFFICE: RPD
REPORT NUMBER:
SUBJECT: Evaluation
KEYWORDS: Railtrack, Accountability, Reform Programs
ABSTRACT: Provides a general summary of railtrack as well as existing powers within railtrack, increasing railtrack's accountability-reform program, financial framework, contracts with train operators, rolling stock approvals, new statutory powers, and conclusions.
Pdf Download PDF Document [471.7 KB]

####