Other Reports

PTC Annual Report for 2015: BNSF Railway

  • 25
  • Jan
  • 2016
AUTHOR: BNSF
REPORT NUMBER: FRA-2010-0056
SUBJECT: Positive Train Control
ABSTRACT: At its maximum BNSF had 19 subdivisions in Revenue Service Demonstration during 2015. In September 2015 BNSF contracted that number down to 6 subdivisions in order to perform a detailed Reliability Study and Root Cause Analysis for the most impactful issues to operating with PTC. As BNSF and its vendors address these issues and Key Performance Indicators come in-line with the metrics expected, BNSF is enabling additional subdivision for PTC Revenue Service in 2016.

####