PTC Annual Report for 2015: Central Florida Rail Corridor

  • 30
  • Mar
  • 2016
AUTHOR: Central Florida Rail Corridor
REPORT NUMBER: FRA-2011-0104
SUBJECT: Positive Train Control
ABSTRACT: In early to mid-2015, CFRC was exploring implementing E-ATC for PTC since E-ATC was being implemented by other commuter rail systems. An open design-build procurement for both E-ATC and I-ETMS was issued in September 2015 but was cancelled because E-ATC was no longer a viable option. Discussions subsequently commenced in earnest with a contractor in the fourth quarter of 2015 to determine an optimal method for implementing I-ETMS. Discussions also took place in 2015 with various hosted services to evaluate the best method for moving forward with PTC for CFRC.