PTC Annual Report for 2015: Conrail Shared Assets Organization

  • 22
  • Jan
  • 2016
AUTHOR: Conrail
REPORT NUMBER: FRA-2010-0064
ABSTRACT: Conrail Shared Assets has completed the installation and in-service of the PTC field equipment. All WIUs are currently reporting signal status to the WSRS. The WSRS is in service and operating. There are currently 5 operational base stations in PTC service under a temporary license through the LLC. The Conrail Shared Assets PTCIP was updated to revision 5 and submitted on January 22, 2016. CSAO is working with venders and contractors to share a hosted BOS and ITCM.