Other Reports

PTC Annual Report for 2015: Regional Transit District Commuter

  • 19
  • Apr
  • 2016
AUTHOR: Regional Transit District Commuter
REPORT NUMBER: FRA-2011-0106
SUBJECT: Positive Train Control
ABSTRACT: Most of the RTD Eagle Project PTC equipment was installed in year 2015, followed by field testing, and starting of integration testing for the East Corridor line segment – the first segment to be open for service in 2016.
Pdf Download PDF Document [277.8 KB]

####