Other Reports

PTC Annual Report for 2015: Utah Transit Authority

  • 26
  • Jan
  • 2016
AUTHOR: Utah Transit Authority
REPORT NUMBER: FRA-2010-0052
SUBJECT: Positive Train Control
ABSTRACT: The Utah Transit Authority’s (UTA) revised PTCIP Version 7.3, dated January 26, 2016, lists E-ATC PTC equipment to be installed on 18 locomotives (100% of the fleet) and 22 cab cars (100% of the fleet) by the end of CY 2011. UTA met the PTCIP goal of equipping 100% of locomotives and cab cars in CY 2011. However, a solution to the No Code Proceed MAS will require a future software modification. The UTA PTCIP also lists I-ETMS PTC equipment to be installed on two locomotives and two cab cars. UTA installed I-ETMS PTC equipment on zero (0) locomotives during CY 2015 (0% of the fleet). UTA met the PTCIP goals of equipping zero (0) locomotives and cab cars in CY 2015.
Pdf Download PDF Document [203.1 KB]

####