Other Reports

PTC Annual Report for 2015: Altamont Corridor Express Authority

  • 01
  • Apr
  • 2016
AUTHOR: Altamont Corridor Express Authority
REPORT NUMBER: FRA-2016-0042
SUBJECT: Positive Train Control
ABSTRACT: As a tenant to the UPRR, Ace is responsible for installing the on-board equipment on the ACE locomotives. ACE is in the process of procuring and installing on-board equipment.
Pdf Download PDF Document [253.5 KB]

####