The Selected Alternative is a corridor-wide vision for the NEC that includes improvements to grow the role of rail within the transportation system of the Northeast. The Selected Alternative prioritizes a corridor-wide commitment to the existing NEC, brings it to a state of good repair, and provides the additional capacity and service enhancements necessary to address passenger rail needs through 2040 and beyond.
The Selected Alternative will improve NEC rail service by establishing corridor-wide objectives for service and performance, and integrated operations for both Intercity and Regional rail services. In the Selected Alternative, the FRA approves modernization of the existing NEC to bring it to a state of good repair and approves infrastructure elements to achieve a corridor-wide Grow Vision only between Washington, D.C., and New Haven, CT, and between Providence, RI, and Boston, MA. For the NEC from New Haven, CT, and Providence, RI, the Selected Alternative does not approve infrastructure elements. In this portion of the NEC, the Selected Alternative requires a capacity planning study, in partnership with Connecticut and Rhode Island, to identify on- and off-corridor infrastructure as needed to achieve the Selected Alternative's service and performance objectives.
The Selected Alternative is a refinement of the Preferred Alternative identified in the Tier 1 Final EIS. In identifying the Selected Alternative, the FRA considered the same factors used to identify the Preferred Alternative – the technical analyses in the Tier 1 Draft EIS, U.S. DOT and FRA policy objectives, and input received from the public and stakeholders. In addition, the FRA considered the technical analyses in the Tier 1 Final EIS and feedback received following issuance of the Tier 1 Final EIS (see Appendix A of the Record of Decision).
The Selected Alternative is a corridor-wide vision for the NEC to achieve modern, efficient passenger rail service for travelers on the NEC, and consists of the following four components:
For more details on each of these components, see the Record of Decision.
The information posted on this website includes hypertext links or pointers to information created and maintained by other public and/or private organizations. The FRA provides these links and pointers solely for information and convenience. When users select a link to an outside website, they are leaving the NEC FUTURE website and are subject to the privacy and security policies of the owners/sponsors of the outside website. The FRA does not control or guarantee the accuracy, relevance, timeliness or completeness of information contained on a linked website, or endorse the organizations sponsoring linked websites, the views they express, or the products/services they offer. The FRA cannot authorize the use of copyrighted materials contained in linked websites and is not responsible for transmissions users receive from linked websites.